Description

The Phoenix Valley Hydropower project is a state-of-the-art hydropower facility featuring an impressive installed capacity of 100MW. This facility is engineered with a robust concrete gravity dam that reaches a maximum height of 61.3 meters. With a remarkable generating capacity of 406 million kWh, it stands as a significant contributor to sustainable energy production. The total static investment for the project amounts to approximately 7 billion yuan, showcasing a substantial commitment to renewable energy. The project commenced in May 2005 and successfully saw all units operational by July 2009.

Specifications

Attribute Details
Installed Capacity 100 MW
Dam Type Concrete Gravity Dam
Maximum Height 61.3 m
Generating Capacity 406 million kWh
Total Investment Approximately 7 billion yuan
Start Date May 2005
Operational Date July 2009

Product Inquiry Form

Share your requirements and our team will connect you with the supplier. Submit your request and we'll follow up within one business day.

Follow-up preferences
Thanks, your message was submitted successfully.