Cliff Yangshan Hydropower

Inquire Now

Description

The Cliff Yangshan Hydropower project is a significant renewable energy initiative with an installed capacity of 120MW. This impressive facility features a dam height of 88 meters and boasts a total water capacity of 247 million cubic meters. The project commenced operations in September 2006, contributing to sustainable energy solutions and supporting the growing demand for clean power.

Specifications

Attribute Details
Installed Capacity 120 MW
Dam Height 88 m
Water Capacity 247 million m³
Project Start Date September 2006

Product Inquiry Form

Thanks your message successfully submitted.