Power Station
Inquire Now
It is used in Power Station, which using 2 units of 2MW CG170-20 and 2 units of 1.5MW CG170-16K. Selling total 7MW power to National Grid. Signed contract in 2017 and completed commissioning in August 2019. So far until now, the gensets were already stably running almost 2 years, no any abnormal situation occurred.
Location: Southeast Asia
Power Rating: 2MW *2+1.5MW *2
Time: Aug, 2019
Fuel: Natural Gas