Description
The Bangladesh Daudkandi, Baghabari 50MW power plant commenced operations in 2010, marking a significant step towards enhancing the energy infrastructure in the region. This heavy fuel power plant is designed to provide a reliable source of electricity, catering to the growing demands of the local population and industries. With a focus on efficiency and sustainability, the plant employs advanced technology to ensure optimal performance and minimal environmental impact.
Specifications
| Attribute | Details |
|---|---|
| Power Output | 50 MW |
| Fuel Type | Heavy Fuel Oil |
| Location | Daudkandi, Baghabari, Bangladesh |
| Operational Start Year | 2010 |
Additional Information
This power plant plays a crucial role in supporting the energy needs of Bangladesh, contributing to economic growth and development. It is equipped with modern safety and efficiency protocols to ensure reliable operations.