The 20 tons of corn flour mill machine plant is a robust and efficient solution designed for large-scale corn processing. With an impressive input capacity of 20 tons per 24 hours, this mill excels at producing high-quality corn flour, corn grit, and feed powder. Its advanced technology ensures that the final products adhere to or exceed the China National Standards, making it an ideal choice for businesses aiming for quality and compliance.

The machine operates with minimal noise and dust, maintaining a clean workshop environment. It utilizes raw materials primarily from flint corn, with specific moisture and density requirements, ensuring optimal processing conditions. The horizontal structure of the equipment maximizes space efficiency while maintaining a compact footprint.

This mill is not only powerful, with a required power of about 120 kW, but also user-friendly, with installation and operational guidance included. It’s designed for easy integration into existing setups and is suitable for various production scales.

Specifications

Parameter Details
Input Capacity 20 tons/24 hours
Final Products
  • Corn Flour: 50-60%
  • Corn Grit: 15-20%
  • Feed Powder (Bran, etc.): 15-19%
Raw Material Requirements Flint corn; moisture rate within 17%; bulk density > 710g/L; hard corn rate > 70%
Power Requirement About 120 kW
Operating Conditions Voltage: 380V, Frequency: 50Hz, Elevation below 1500m
Equipment Size L 17M * W 5M * H 5M
Container Requirement 1x40HQ

Additional Information

The installation of the corn flour mill machine plant is provided as a charging service, including installation guidance, test running, and training local workers. Buyers are responsible for covering visa fees, round trip tickets, food, and boarding for technicians, as well as local transportation and medical insurance. Each technician is compensated at 100 USD per day, and it is recommended to have 4-6 worker assistants during installation, which typically takes 30-40 days.

For optimal operation, each shift requires one operation technician and six workers to manage the packing system and package transportation. Customers are required to supply necessary hoisting equipment, water supply, and electricity (transformer not less than 150 kW). The supplier will handle the layout design and guide the installation process.