The cement grinding station is designed to achieve an impressive annual output of 1 million tons. This state-of-the-art facility utilizes advanced technology for the separate grinding of clinker and slag. The clinker grinding process employs a combined technique featuring two Φ 4.2m × 13m cement mills, ensuring a stable production process that delivers high quality, high yield, and low consumption.
Key processes include an efficient design for both clinker and slag grinding production lines, incorporating precise measuring, mixing, and grinding procedures. Materials are meticulously handled from weighing to grinding, ensuring optimal efficiency and product quality. The system includes advanced equipment such as the O-Sepa Separator and an 8-spout rotation cement packer, which enhance operational performance and product consistency.
Specifications
ITEM NO. | TECHNICAL SPECIFICATION | NUMBER |
---|---|---|
Cement proportioning station | ||
Cement mill | 2 | |
Spec: Φ4.2×13m | ||
Capacity: 75-80 t/h (PCC) 4000 cm2/g, Residue: Below 5% |
||
Rotation speed of shell: 16.3±0.1 r/min | ||
O-Sepa Separator | 2 | |
Type: N-2500 | ||
Capacity: 90~150 t/h | ||
Max feeding rate: 450 t/h | ||
Product fineness: 3100~4000 cm2/kg | ||
Air Flow: 2500 m3/min | ||
Separator structure, pipe line etc | ||
Rotation speed of rotor: 145~210 r/min | ||
Resistance Equipment: 1.4~1.8 kPa | ||
8-spout Rotation cement packer | 2 | |
Type: 8RS-PC | ||
Capacity: 100~120 t/h | ||
Air quantity: 40~45 m3/h, P=5 bar | ||
Duse Air rate: 8400 m3/h | ||
Negative pressure: 60 mm H2O |