The EPC contractor specializes in steel structures for industrial and commercial applications. Equipped with strong technical expertise, cutting-edge production machinery, and advanced processing technology, the company boasts fixed assets exceeding 90 million yuan. Their facilities include two automatic production lines for H-beams, a dedicated production line for box girders, and additional lines for steel pretreatment and color steel profiled plates. With an impressive annual production capacity, they can produce over 40,000 tons of H-beams and up to 120,000 tons of steel pretreatment per shift. Furthermore, they operate production lines for plastic and aluminum alloy windows, delivering an annual output of 100,000 square meters.
The company has built a strong reputation by partnering with notable foreign entities such as Hyundai Iron Making Co., Ltd., Hyundai Kia Automobile Group Co., Ltd., and Sanyo (Zhuzhou) of Japan, as well as renowned domestic enterprises including CSCEC and CCCC. Their projects encompass the construction of industrial workshops, processing of steel components, and the development of large-scale public facilities. Notable completed projects include the Hyundai Weiya automobile engine project across four phases and various significant undertakings in modern automotive transmission and machinery.
Specifications
Attribute | Details |
---|---|
Annual Production Capacity of H-beams | 40,000 tons |
Annual Production Capacity of Steel Pretreatment | 120,000 tons |
Annual Production Capacity of Plastic Windows | 100,000 square meters |
Annual Production Capacity of Aluminum Alloy Windows | 100,000 square meters |
Main Construction Area (Hyundai Pevotai Transmission Project) | 100,000 square meters |
Additional Information
– Major construction projects include:
– Hyundai Weiya automobile engine project (Phases 1 to 4)
– Modern Pevotai transmission project (Phases 1 to 3)
– Modern Daimosi automobile transmission project (Phases 1 to 2)
– Ruirong machinery project (Phases 1 to 4)
– Various facilities such as power stations, distribution rooms, and fire pools.