Gazi-Barotha Hydropower Station in Pakistan

Inquire Now

Description

The Gazi-Barotha Hydropower Station is a state-of-the-art facility located in Pakistan, designed to harness the immense power of the Indus River. With a total installed capacity of 1475MW, this power plant stands as a testament to modern engineering and sustainable energy production. The mechanical and electrical engineering design was meticulously crafted, showcasing the expertise of leading contractors in the competitive bidding process. Officially commencing electricity generation in August 2003 with its first two units, the plant achieved full production with all five units operational by April 2004. This facility not only contributes significantly to the region’s energy supply but also exemplifies innovative approaches to renewable energy.

Specifications

Attribute Details
Total Installed Capacity 1475 MW
Location Indus River, Pakistan
Commissioning Date August 2003
Full Production Date April 2004
Number of Units 5

Product Inquiry Form

Thanks your message successfully submitted.