Gazi-Barotha Hydropower Station in Pakistan
Inquire NowDescription
The Gazi-Barotha Hydropower Station is a state-of-the-art facility located in Pakistan, designed to harness the immense power of the Indus River. With a total installed capacity of 1475MW, this power plant stands as a testament to modern engineering and sustainable energy production. The mechanical and electrical engineering design was meticulously crafted, showcasing the expertise of leading contractors in the competitive bidding process. Officially commencing electricity generation in August 2003 with its first two units, the plant achieved full production with all five units operational by April 2004. This facility not only contributes significantly to the region’s energy supply but also exemplifies innovative approaches to renewable energy.
Specifications
Attribute | Details |
---|---|
Total Installed Capacity | 1475 MW |
Location | Indus River, Pakistan |
Commissioning Date | August 2003 |
Full Production Date | April 2004 |
Number of Units | 5 |