High chrome casting grinding ball / cylpebs

Inquire Now

High chrome grinding Cylpebs is a casting alloy grinding media contain 10-28% chrome. this grinding media used in Ball mill / SAG mill for Mining / Cement and other industry, to mill & crush ore/ coal / sand / cement and other material.
Its have good micro structure by Alloy casting, and have good hardness and broken rate through heat treatment. So used this 10-28% Cr grinding Cylpebs will get lower wear rate and reduce the ball mill downtime.

CHARACTERISTICS OF high chrome grinding Cylpebs

High chrome grinding Cylpebs is a casting alloy grinding media contain 10-28% chrome. this grinding media used in Ball mill / SAG mill for Mining / Cement and other industry, to mill & crush ore/ coal / sand / cement and other material.

Its have good micro structure by Alloy casting, and have good hardness and broken rate through heat treatment. So used this 10-28% Cr grinding Cylpebs will get lower wear rate and reduce the ball mill downtime.

STANDARDS / DESIGNATIONS

GB/T 17445-2009 (CN)

ASTM 531/A 532M-93A (US)

EN 12513:2000E (EU)

MECHANICAL PROPERTIES

Micro Structure: Martensite + Carbide + residual Austenite

IMPACT Value: Min. 3.5J/cm2

Surface Hardness: HRC 58-63

Hardness variationfrom surface to core): Max HRC 2

Times of Falling ball : Min. 28000

Breakage and deshaping : Max 0.5%

CHEMICAL COMPOSITION

Carbon / C : 2.0-3.2 (%)

Silicon / Si: 0.3-1.2 (%)

Manganese / Mn: 0.21.5 (%)

Chromium / Cr: 10.0-28.0 (%)

Nickel/ Ni: Max 1.20 (%)

Molybdenum/ Mo Max 1.50 (%)

Cooper / Cu: Max 1.50 (%)

Phosphors / P: Max 0.10 (%)

Sulfur / S: Max 0.12 (%)

SIZE: diamater * length

8*8 / 10*10 / 12*12 / 14*14 / 16*16/ 18*18 / 20*25/ 25*30/ 25*38 / 30*35 / 35*40/ 40*45/ 45*50/ 50*55/ 55*60 /60*70 mm

PACKAGE:

Metal Drum + Wooden pallet, 800-1000 kgs per drum, 2 drum on one pallet;

MOQ:

50 tons for each shipment ( FCL 2 Containers), 5 tons for each size & each chrome content;

Lead-time:

0-100 tons, 15-20 days with one shipment ;

100-500 tons, 15-30 days, each week ship out 100 tons with one shipment ;

500-5000 tons, 15-150 days, each week ship out 250 tons with one shipment;

Payment term:

20% deposit, balance T/T within 7 days after B/L copy.

Product Inquiry Form