Huaneng Haimen Power Plant project (2 × 1000MW)

Inquire Now

Description

The Huaneng Haimen Power Plant project is a groundbreaking energy facility featuring two ultra-supercritical thermal power units, each with a capacity of 1000MW. This state-of-the-art plant, which commenced operation in April 2010, is notable for being the world’s first seawater Flue Gas Desulfurization (FGD) plant. The project achieved significant milestones, including a 168-hour test run on June 30, 2009, and September 27 of the same year, demonstrating its compliance with rigorous standards. Additionally, it integrates the first desulfurization and denitrification projects alongside the main construction, highlighting its commitment to energy efficiency and environmental protection. The plant is strategically positioned to support the Southern Power Grid and enhance energy supply throughout Guangdong Province, making it a pioneering example of modern energy solutions.

Specifications

Attribute Details
Units 2 x 1000MW
Test Run Dates June 30, 2009; September 27, 2009
Operational Date April 2010
Type Ultra-supercritical thermal power station
Environmental Features Seawater FGD, Desulfurization, Denitrification
Region Guangdong Province

Product Inquiry Form

Thanks your message successfully submitted.