Indonesia Central Kalimantan Coal Railway
Inquire NowIndonesia Central Kalimantan Coal Railway
The first stage of this project is composed of the railway and special coal terminal (port).
The route commences from Lakutan and goes south to port Roanggailang, with a total length of 282 km. The survey and design work of the whole project was provided by CRIG.