Indonesia Central Kalimantan Coal Railway
Inquire NowDescription
The Indonesia Central Kalimantan Coal Railway is a significant infrastructure project designed to facilitate efficient coal transportation. This railway stretches an impressive 282 kilometers, beginning from Lakutan and extending southward to the Roanggailang port. The first phase includes not only the railway itself but also a specialized coal terminal, ensuring optimal loading and unloading capabilities. The entire project has undergone meticulous survey and design work conducted by CRIG, reflecting a commitment to quality and precision in enhancing the region’s coal export capabilities.
Specifications
Attribute | Details |
---|---|
Project Type | Coal Railway |
Length | 282 km |
Starting Point | Lakutan |
Ending Point | Roanggailang Port |
Design and Survey | Conducted by CRIG |
Related Products
Product Inquiry Form
Thanks your message successfully submitted.