Indonesia Central Kalimantan Coal Railway

Inquire Now

Indonesia Central Kalimantan Coal Railway

The first stage of this project is composed of the railway and special coal terminal (port).
The route commences from Lakutan and goes south to port Roanggailang, with a total length of 282 km. The survey and design work of the whole project was provided by CRIG.

Product Inquiry Form