No-dig Pipe Rehabilitation Liner
Inquire NowDescription
The No-dig Pipe Rehabilitation Liner is a revolutionary solution designed for rehabilitating pipes without the need for extensive excavation. This innovative product is capable of rehabilitating over 2000 meters of piping, making it ideal for situations where traditional digging is not feasible. The ZYfire liner is engineered to bend up to 45°, allowing for flexibility in various installations. It is composed of fabric-reinforced flexible plastic, ensuring durability and resistance to higher internal pressures.
One of its standout features is the elimination of chemical adhesive resins, reducing odor pollution and making it a more environmentally friendly option. This system allows for quick installation with minimal construction disruption and requires low maintenance. The ZYfire Liner is versatile, applicable for rehabilitating water, oil, gas, and hot water pipes, and operates effectively within a temperature range of -40℃ to 120℃. Additionally, it comes with complete solutions, including flange joint connections and technical consulting services, ensuring a comprehensive rehabilitation approach.
Specifications
Description | Parameter |
---|---|
Host Pipe ID | 80mm ~ 800mm (3” ~ 32”) |
Max. Operation Pressure | 1.0Mpa ~ 8.0Mpa |
Max. Bursting Pressure | 3.0Mpa ~ 24Mpa |
Max. Length of Installation | ≥ 4000m (13,200ft) |
Wall Thickness | 4mm ~ 8mm |
Abrasion Resistance (DIN53516) | 10.5mm3 |
Temperature of Media | Up to 50℃ (122℉) |
Installation Mode | Fold in U-sharp |
Pulling Speed | Up to 400m/h |
Service Life Duration | 50 years |
**All the above technical parameters depend on diameter. |
Additional Information
- Quick installation and low maintenance requirements.
- Environmentally friendly with no chemical adhesives.
- Suitable for a variety of pipe rehabilitation applications.