OEM ODM Phoenix Valley Hydropower Hydropower
Description
The Phoenix Valley Hydropower project is a state-of-the-art hydropower facility featuring an impressive installed capacity of 100MW. This facility is engineered with a robust concrete gravity dam that reaches a maximum height of 61.3 meters. With a remarkable generating capacity of 406 million kWh, it stands as a significant contributor to sustainable energy production. The total static investment for the project amounts to approximately 7 billion yuan, showcasing a substantial commitment to renewable energy. The project commenced in May 2005 and successfully saw all units operational by July 2009.
Specifications
| Attribute | Details |
|---|---|
| Installed Capacity | 100 MW |
| Dam Type | Concrete Gravity Dam |
| Maximum Height | 61.3 m |
| Generating Capacity | 406 million kWh |
| Total Investment | Approximately 7 billion yuan |
| Start Date | May 2005 |
| Operational Date | July 2009 |