Should bar project

Inquire Now

Description

The Should Bar Project is an extensive infrastructure initiative that encompasses a 4.4 km main line route, showcasing exceptional engineering and construction quality. The project includes significant earth and rock excavation, totaling 1,081,000 cubic meters, with further filling of 917,000 cubic meters. It features three bridges spanning a total of 2,592 meters, a tunnel of 1,782 meters, and various drainage and protection works. Officially launched on January 15, 2010, the project reached basic completion by the end of 2011, demonstrating a commitment to high standards and meticulous planning. The project has been recognized for its aesthetic appeal and adherence to design specifications, solidifying its reputation within the industry.

Specifications

Attribute Details
Main Line Route Length 4.4 km
Earth Excavation 1,081,000 cubic meters
Fill Volume 917,000 cubic meters
Bridge Length 2,592 meters (3 bridges)
Tunnel Length 1,782 meters (2 tunnels)
Culvert and Drainage Works 34,000 cubic meters
Project Duration 22 months
Completion Date End of 2011

Additional Information

The project was executed under the guidance of the high-speed construction headquarters in Pakistan, benefiting from robust leadership and support. It has received accolades for excellence, including multiple awards during labor competitions, reflecting the dedication and teamwork of all involved.