Si Dengwo generation of hydropower station in Cambodia

Inquire Now

Description

The Si Dengwo hydropower station in Cambodia represents a significant advancement in renewable energy, harnessing the power of the Le Race River tributaries. This project is divided into two key developments: the first level of the dam toe power station, which boasts an installed capacity of 2 × 10MW, and a second diversion power plant with an impressive installed capacity of 4 × 25MW. Together, these facilities contribute to a total installed capacity of 120MW, positioning the Si Dengwo project as one of the larger bilateral cooperation investment initiatives in the region. This endeavor not only enhances energy production but also underscores a commitment to sustainable development in the Kingdom of Cambodia.

Specifications

Feature Details
Location Cambodia
Power Station Types Dam Toe Power Station, Diversion Power Plant
Installed Capacity (Dam Toe) 2 × 10MW
Installed Capacity (Diversion) 4 × 25MW
Total Installed Capacity 120MW

Additional Information

This project is a testament to the growing importance of renewable energy initiatives in Cambodia, providing not only power but also fostering international cooperation in energy development.

Product Inquiry Form

Thanks your message successfully submitted.