Sue Denmark refers project

Inquire Now

Description

The Sue Denmark project is a significant engineering endeavor focused on enhancing Sudan’s water resources infrastructure. This transformative initiative includes the construction of a 500 kV transmission line spanning 389 km and a 220 kV double loop covering an additional 30 km. In total, the project encompasses approximately 419 km of power lines, supported by the establishment of seven newly-constructed substations. The project is systematically divided into six sections, with the Jilin province serving as a key area for construction tasks, ensuring efficient transmission of electrical power across the region.

Specifications

Specification Details
Project Type Water Resources Engineering
Transmission Lines 500 kV (389 km), 220 kV double loop (30 km)
Total Length of Power Lines 419 km
Substations 7 newly-constructed substations
Construction Sections 6